Rach Mieu Bridge—Vietnam
 

Construction of pylons
 
Instrumentation for a cable-stay bridge, installed during construction.

Provision and installation of instruments with technology transfer for the long term monitoring.

Employer / Owner: Ministry of Transportation PMU9—Vietnam.
Engineer: Transportation Engineering Design Inc. (TEDI).
Instrumentation Specialist: FT Laboratories and VSL VN.
Duration: Oct 05 to Dec 07.


Scope included the installation and supervision of:

Þ Strain gauges
Þ Temperature sensors
Þ Anemometers
Þ Accelerometers
Þ In-place tiltmeters
Þ Mono-strand load cells
Þ Real-time monitoring system
  Bridge instrumentation
 
For further enquires including copy of technical papers published, please contact:
Mr. Eric Ho
Tel: +852 2758 4861
E-mail: eric.ho@ft.com.hk